TPT
Total:
$0.00

Scatter Plot Project on Desmos with Template

;
Alanna Hunter
0 Followers
Grade Levels
7th - 9th
Standards
Formats Included
  • Google Slides™
Pages
7 pages
$4.00
$4.00
Share this resource
Report this resource to TPT
Alanna Hunter
0 Followers
Made for Google Drive™
This resource can be used by students on Google Drive or Google Classroom. To access this resource, you’ll need to allow TPT to add it to your Google Drive. See our FAQ and Privacy Policy for more information.

Description

Learners will work to collect their own data from something they are interested in. They will then create a scatter plot using Desmos.com and analyze the information they collected. The analysis includes drawing their own trend line, finding the equation of that trend line, and predicting 3 values outside their original data collection.

There are detailed directions with screenshots included along with a Google Slides template that can be shared with learners to help them organize their work.

I have included an example that a former learner created. Please note that the directions and template have changed slightly since then.

Total Pages
7 pages
Answer Key
Does not apply
Teaching Duration
3 days
Report this resource to TPT
Reported resources will be reviewed by our team. Report this resource to let us know if this resource violates TPT’s content guidelines.

Standards

to see state-specific standards (only available in the US).
Construct and interpret scatter plots for bivariate measurement data to investigate patterns of association between two quantities. Describe patterns such as clustering, outliers, positive or negative association, linear association, and nonlinear association.
Know that straight lines are widely used to model relationships between two quantitative variables. For scatter plots that suggest a linear association, informally fit a straight line, and informally assess the model fit by judging the closeness of the data points to the line.
Use the equation of a linear model to solve problems in the context of bivariate measurement data, interpreting the slope and intercept. For example, in a linear model for a biology experiment, interpret a slope of 1.5 cm/hr as meaning that an additional hour of sunlight each day is associated with an additional 1.5 cm in mature plant height.

Reviews

Questions & Answers

0 Followers